In 1988, Spectre Entered into a Financing Agreement with Industrial Development Bank Limited (Now IDB Capital Limited) for Expansion.A New Factory was Constructed Along Mombasa Road,  that Integrated the Old Plant. The New Facility Served New Cylinder Manufacture which

  • Increased Working Space
  • Accommodate New Machinery & Equipment
  • The Old Plant Served Revalidation.

Following Challenges in Efficiently Operating Two Standalone Facilities, Spectre Consolidated Manufacturing & Revalidation into the New Facility

Factory Upgrade

In Year 2008, Spectre Installed a New Cylinder Manufacturing Plant, some Machines were replaced and some Processes were Automated
Basis of Upgrade was to Gain Competitive Edge Over Imports & Reclaim Lost Market Share. the upgrade included:

  • New Equipment Installed
  • Heat Treatment Furnace
  • New Automated Furnace
  • Electronic Temperature Control
  • Automated Cylinder Feeding, Movement & Output
  • Improved Safety
  • Higher Throughput
  • Hydrostatic Testing Rig
  • Simultaneous Hydrostatic Testing of Ten Cylinders
  • Ensure Economical Use of Water Thru Recycling
  • Mechanized Testing - Injects, Pressurizes & Removes Water from Cylinder
  • Shot-blasting Machine
  • Superior Cylinder Movement by Rotating Rollers & Rocker Mechanism
  • Spray Painting System & Oven Drying
  • Replaced Spray Painters
  • Economical Use of Paint by use of booths
  • Working at About 80 Deg. C, Painted Cylinders Dry Immediately Without Delay



 